Ampere – Serial Electric Hybrid – 17.5m (57.5’) Built – Wharf House Narrowboats 05/2015 (Launch) Engine – TEMA SPM132-12: upgraded to 15kW Generator – Fischer Panda 8000NE PMS Batteries – 6…
Ampere – Serial Electric Hybrid – 17.5m (57.5’) Built – Wharf House Narrowboats 05/2015 (Launch) Engine – TEMA SPM132-12: upgraded to 15kW Generator – Fischer Panda 8000NE PMS Batteries – 6…
Speedy Whippet II – Parellel Hybrid – 20.85m (68.5’) In Build – Aqua Narrowboats 04/2024 (Estimated Launch) Engine – Hybrid Marine Beta 50hp with 10kw Drive Motor Generator – Hybrid…
Old Nick – Serial Electric Hybrid – 17.85m (58.5’) Built – Ortomarine 12/2020 (launch) Engine – Vetus E-Line 10kW (Water Cooled) Generator – Vetus GLX6,5SIC – 6kVA Generator Batteries –…
Perseverance – Serial Electric Hybrid – 18.89m (62′) Built – Ortomarine 05/2021 (launch) Engine – Tema SPM132-1 – 12kW (Air Cooled) Generator – Beta Marine BG1105 – 10kVA Generator Batteries…
Electric Dragon – Serial Electric Hybrid – 18.29m (60′) Built – Ortomarine 07/2023 (launch) Engine – Engiro 205W 08016 SSE – 12kW (Water Cooled) Generator – Fischer Panda PVMV-N 8000i…
Eau de Folles – Serial Electric Hybrid – 13.72m (45′) Built – Ortomarine 05/2022 (launch) Engine – Bellmarine Drivemaster EM220-20W (15kW with 20kW boost) (Water Cooled) Generator – Sole Genset…
Professor Pat Pending – Serial Electric Hybrid – 17.68m (58′) Built – Ortomarine 02/2022 (launch) Engine – Bellmarine Drivemaster EM220-20W (15kW with 20kW boost) (Water Cooled) Generator – Solé Genset…
Hunky Dory – Serial Electric Hybrid – 18.59m (61′) Built – Ortomarine 08/2020 (launch) Engine – Bell Marine Drivemaster 15W EVO Motor (10kW with 15kW boost) (Water Cooled) Generator –…
Cafwin Cruises Narrow Boat Holidays Ltd is an eco-friendly luxury boutique narrowboat holiday company, based out of Droitwich Spa Marina, covering the beautiful waterways of Worcestershire, Warwickshire and Gloucestershire. It…
The Electric Boat Association (EBA) champions the interests of electric boat owners. We’re here to help with issues such as waterway access, charging points, slipway facilities, reduced licence fees and…